Alpiq

Shareholder

Alpiq 100%

Production

Part of production reverting
to Alpiq: 100%
Average annual production:
320 mill. kWh
Connection to 65 and 125 kV grids

Chandoline power station 
alt. 493 m

2 x 5 Pelton turbines 
Total power: 150 MW
Height of fall: 1,748 m

The power station turbines were originally driven by the waters of the first Dixence dam which was inundated in the Lac des Dix in 1957. Up to this time it held the world record for the highest height of fall.
The Chandoline installations are closely linked with the activities of the Grande Dixence SA and the Cleuson-Dixence complexes.

Cleuson pumping station

Power 4.1 MW, max. output 2.2 m³/s

 

Grande Dixence dam

alt. 2365 m
 

 

Construction: 1950 - 1964
Commissioned: 1961 -1965
Type: gravity dam
Height: 284 m
Crown: 700 m
Retention capacity: 385 mill. m³
Surface: 4.04 km²


Cleuson dam

alt. 2186 m

Construction: 1947
Commissioned: 1949-1951
Type: gravity dam recessed
Height: 87 m
Crown: 420 m
Retention capacity: 20 mill. m³
Surface area: 50 ha

Recommend this page to a friend  Download this page (PDF)  Print this page 
News
The meeting of the Swiss electricity sector from 12th to 14th June, 2012 at the Messe, Zürich.

HYDRO Exploitation
is 10 years old

Get more news soon on
this anniversary.

Sitemap - Contact
HYDRO Exploitation SA   |   Rue des Creusets 41   |   CP 750 - CH-1951 Sion   |   T +41 (0) 27 328 44 11   |   F +41 (0) 27 328 44 12
powered by conchita-plus | Eddy Pelfini Graphic Design