Recent projects

Every year HYDRO Exploitation undertakes more than 1,000 maintenance and repair projects.
Some important works have involved closing down the activities of the Electricité d'Emosson SA development – a Franco-Swiss...
In February, we conducted several rehabilitation works for our client Rhonewerke AG in Ernen (Upper Valais). Our collaborators worked in...
In spring 2012, an important step was taken in the carrying out of a global project, namely replacing the safety units at the Hongrin dam, owned by...
Following extremely bad weather in the Lötschental last October, the Ferden dam (Upper Valais) operated by the firm EnAlpin, had to be urgently purged of...
Since mid-November, group number 3 at the Martigny-Bourg Station has been in service again having been rehabilitated in 2011....
The rehabilitation works at the Nendaz power station started on site in March 2011. This mandate was...
Until 2014, we shall be contributing to the renewal of the Control System at the Chancy-Pougny (on the French-Swiss frontier) which was brought...
Between March and August 2011, we started the anticorrosion treatment of the Dix-Rhone head. This stretches from the Grand Dixence dam to the...
Renovation of both generating sets of the Salanfe SA power station in Miéville is part of a major overhaul taking place after more than 40...
In order to manage the sand-silting of the Lac des Dix, the former EOS dam, which is nowadays submerged most of the time, serves as a sand...
HYDRO Exploitation was commissioned by Aegina AG to analyse and carry out the renovation of the Altstafel power...
After 9 years of shutdown, Bieudron power station is running...
Repair of the three MFO and three Sécheron generating sets at Fionnay power station began in 2008. It will be complete in 2012....
Our clients
Our strengths
Operation and maintenance
Central workshops
Recommend this page to a friend  Download this page (PDF)  Print this page 
News
The meeting of the Swiss electricity sector from 12th to 14th June, 2012 at the Messe, Zürich.

HYDRO Exploitation
is 10 years old

Get more news soon on
this anniversary.

Sitemap - Contact
HYDRO Exploitation SA   |   Rue des Creusets 41   |   CP 750 - CH-1951 Sion   |   T +41 (0) 27 328 44 11   |   F +41 (0) 27 328 44 12
powered by conchita-plus | Eddy Pelfini Graphic Design