Salanfe

Shareholder

Alpiq 100%

Production

Part of production reverting to
Alpiq: 100%
Average annual production:
120 mill. kWh
Connection to 65 kV grid

Pumping stations

Clusanfe – 5,400 m³
Power 880 kW,
max. output 2.0 m³/s

Giétroz du Fond – 20,000 m³
Power 1,026 kW,
max. output 0.6 m³/s

Miéville power station - alt. 452 m

2 Pelton turbines 
Total power: 60 MW
Height of fall: 1,472 m

 

Salanfe dam

alt. 1925 m

 

Construction: 1947
Commissioned: 1950
Type: gravity dam
Height: 52 m
Crown: 616 m
Retention capacity: 40 mill. m³
Surface area: 185 ha
Basin catchment area: 31.8 km²