Alpiq 100%
Part of production reverting to Alpiq: 100% Average annual production: 120 mill. kWh Connection to 65 kV grid
Clusanfe – 5,400 m³ Power 880 kW, max. output 2.0 m³/s
Giétroz du Fond – 20,000 m³ Power 1,026 kW, max. output 0.6 m³/s
2 Pelton turbines Total power: 60 MW Height of fall: 1,472 m
alt. 1925 m
Construction: 1947 Commissioned: 1950 Type: gravity dam Height: 52 m Crown: 616 m Retention capacity: 40 mill. m³ Surface area: 185 ha Basin catchment area: 31.8 km²